Last updated:
Every Yarn Ink order is printed after you place it, which gives you a short window to fix things before ink meets fabric or ceramic. This page explains that window: how long it lasts, what you can change inside it, exactly what to put in your email, and what your options are once it has closed. If your order has already arrived and something is wrong with it, you want the Returns & Exchanges Policy instead.
Cancelling or changing at a glance
- The window: 24 hours from the moment you place your order.
- How: email support@yarnink.shop. There is no cancel button on the site.
- What you can change: name text, size, colour, design or tool option, items, and the shipping address.
- Cost: nothing. Changes and cancellations within the window are free.
- After 24 hours: the order may already be printing; contact us and we will help where we can, and the 60-day return still applies once it arrives.
- No proof is sent: what you typed, as shown on the name drawing on the product page, is what gets printed.
1. Why the window is 24 hours
Printing takes 1–3 business days, and it starts from the order, not from a reminder or a proof. No proof is emailed before printing: the name drawing on the product page shows your text before you add it to your bag, and that is the version that goes to print. So the 24 hours after you click to place an order are your chance to spot a slip while the order can still be adjusted. Once the window closes, the order may already be on its way to being printed, and a printed name cannot be unprinted.
The window runs for 24 hours from the time on your order confirmation email, including evenings and weekends. Our replies come within 24 hours on business days, but what matters for the window is when your email reaches us, so write as soon as you notice the problem, even at 11 p.m. on a Saturday.
2. A timeline of one order
| Stage | When | Your options |
|---|---|---|
| Order placed | Hour 0 | Confirmation email arrives; read it through, especially the name text |
| Change window open | Up to 24 hours after ordering | Email us to cancel or change anything listed in section 3 |
| Printing | Within 1–3 business days of ordering | Contact us and we will help if we can; a change is no longer guaranteed |
| In transit | 7–14 business days after printing | Wait for delivery, then use the 60-day return if needed |
| Delivered | Day of delivery onward | Return any item within 60 days, for any reason, with a free label |
3. What you can change inside the window
Name and text fields
Correct a spelling, swap the name for a different one, or fix the optional second line or since-year on products that have one. Name fields allow up to 16–22 characters depending on the item, so if the new text is longer than the old one, check it fits the limit on that product page before you send it to us.
Tool choice
Personalised designs come with a tool choice: two knitting needles, one crochet hook, or a quilt block and rotary cutter. If you picked the wrong craft, this is the easiest thing in the world to switch within 24 hours.
Size and colour
Switch a tee, crewneck sweatshirt or the hoodie to another size or colour offered on that product page. If you are unsure, compare with the Size Guide before you email, so you change it once rather than twice.
Items in the order
Remove an item, or replace one product with a different one. To add something new, it is usually quickest to place a second order; shipping is free, so a second order costs nothing extra to send.
Shipping address
Fix a unit number, a ZIP or postal code, a misspelled street or the recipient’s name, or redirect a gift to a different address in the United States, Canada, Australia or New Zealand. Those are the only countries we ship to.
Cancel the whole order
If you no longer want any of it, ask us to cancel. Once we confirm by email, the full amount you paid is refunded to your original payment method. The Refund Policy covers the money side.
4. How to ask: the email that gets it done in one go
Email support@yarnink.shop with “Order change” or “Cancel order” in the subject line. Include:
- Your order number, from the confirmation email.
- The name and email address used at checkout.
- Which item the change is for, if the order has more than one.
- Exactly what is wrong and exactly what it should be. Write the new text the way it should appear, letter by letter, including capitals and apostrophes.
- For an address change, the full new address, not only the part that changed.
Your request is settled when you receive our reply confirming the change or cancellation. If you have not had a reply yet, that does not mean the window has closed for you: what counts is that your email reached us inside the 24 hours.
Good request, slow request
“Please change it to Ellie” is slow: which item, which order, which field? “Order 1234, Craft Room Name Crewneck Sweatshirt, top line should read Ellie’s Yarn Den, not Ellies Yarn Den” is done in one reply.
5. Three changes in real life
A typo spotted two hours later
Someone orders the Custom Name Cotton Tote Bag for Small Projects with the name “Margeret”. Two hours later, rereading the confirmation email over a cup of tea, they see it: Margaret. They email us with the order number and the corrected spelling, we confirm the change, and the bag is printed correctly. The same slip noticed only when the bag arrives is still fine, but it becomes a 60-day return with a free label instead of a quick email; see the Returns & Exchanges Policy.
Needles for someone who crochets
A partner orders a personalised gift and picks two knitting needles. That evening, scrolling through photos of the recipient’s latest blanket, they notice one hook and no needles in any picture. One email within the 24 hours switches the tool option to the crochet hook before anything is printed.
A shawl that outgrew its bag
A knitter orders the Custom Name Cotton Tote Bag, 15 × 16.5 in (38 × 42 cm), for a shawl. That night they lay the shawl, still on the needles, flat on the table and measure it. It has grown well past the plan, and the cotton tote looks tight. The Craft Room Name Tote Bag with Flat Base is listed at 16 × 14.5 × 5 in (40.6 × 35.6 × 12.7 cm), and the extra 5 in (12.7 cm) of depth gives a bulky WIP more room. They email us within the window to swap the bag, with the same name. Measuring a project flat before the window closes is the best habit a bag buyer can have.
6. Group and repeat orders
A stitch-night organiser ordering eight Custom Stitch Night Group T-Shirts one by one, each with the same group name and since-year, has eight separate orders and eight separate 24-hour windows. If the group decides on a different since-year halfway through, the organiser should email us with every order number that needs the change; the window for each order is counted from that order’s own time. Orders placed more than 24 hours earlier may already be printing, so list them anyway and we will tell you which ones we can still change.
Before placing a group order, it helps to settle the exact text in writing with the group first, then copy and paste it into every order. That avoids “Tuesday Stitchers” on five shirts and “Tuesday Stichers” on three.
Matching pieces ordered separately
A quilter orders the Craft Room Name Ceramic Mug with “The Sewing Loft”, then a day later decides a matching Craft Room Name Crewneck Sweatshirt would be nice and places a second order, typing the name from memory as “The Sewing Lofts”. The second order is still inside its own 24-hour window, so one email with that order number and the correct text brings the two pieces back into line. When you want items to match, copy the text from your first confirmation email rather than retyping it.
7. What a change does not affect
- Shipping: still free, to the same four countries, whatever you change.
- Personalisation: still free; changing the name text never adds a charge.
- Your return rights: a changed order has the same 60-day return window from delivery as any other order.
- Delivery estimate: printing takes 1–3 business days and transit 7–14 business days, counted as described on the Shipping & Delivery page.
8. After the 24 hours
Once the window has passed, your order may already be printing. Email us anyway and we will help where we can, but we cannot promise a change at that point. If the order goes ahead as placed, you still have every option once it arrives:
- Return any item within 60 days of delivery, for any reason, personalised pieces included.
- For a change of mind, we email you a free return label.
- Your refund is issued within 7 days of the return reaching us, to your original payment method, or as store credit that never expires.
- If you want the item in a different size or with different text, place a new order and return the first one; see the exchange steps in the Returns & Exchanges Policy.
If the parcel has already shipped and only the address is wrong, email us with the order number and the correct address straight away, and we will help with what can be done for that order.
9. Avoiding changes in the first place
Most change requests come from the same handful of slips. A two-minute check before you add to your bag saves an email later:
- Read the name drawing on the product page. It shows your text on the item. Check spelling, capitals and apostrophes there.
- Check the tool choice. Two needles for knitting, one hook for crochet, quilt block and rotary cutter for quilting.
- Check the character count. Name fields allow up to 16–22 characters depending on the item.
- Measure before choosing a size. Lay a favourite tee, sweatshirt or hoodie flat and compare it with the Size Guide.
- Measure the project before choosing a bag. A WIP laid flat tells you more than a guess.
- Check the address. Unit number, ZIP or postal code, and for gifts the recipient’s name.
10. Contact us
Email support@yarnink.shop for a change, or use this prefilled cancellation email. We reply within 24 hours on business days; support is by email only. Other prefilled emails are on the Submit a Ticket page, and the Order Tracking page explains how to follow your order once it is on its way. For delivery times, see Shipping & Delivery.
Yarn Ink, 13930 Grand Pointe Blvd, Northport, AL 35475, US.